Neighbors
Built By: Mike Maloney
Description: Last minute build of a single, on 3/4 plywood with 2" foam topper.
Includes a Route 160 compatible roadway and two homes.
This one took about an hour to build and scenic as I already had the plywood from an unused shelf. I think it was still damp when we set up our first T-TRAK layout on 9/21/2014.
