NTTT Main Yard
Built By: George L
Revised By: Vic McTee
Description: Our main yard after the 2017 revision. The yard ladder was changed so that only straight track was on a module edge. Two additional modules were built for the reverse ladder. Three transition modules were also built and consist of two "entry" transitions used for inline configuration and one exit transition used in both the T and inline configurations. The transition modules bring the yard tracks to standard T-TRAK locations.
For the curious the AnyRail file can be downloaded and is: NTTT Yard
New Version (Jan 2017)
T-Configuration
Inline Configuration
Old Version (prior to 2017)